Thursday 20 October 2022

Is 2022 the year to finally get those ground works done?

As the year draws to a close many of us will be thinking back on the plans we made for 2021 and asking why they didn’t come to fruition. And the chances are we just didn’t find the time to go to the gym, eat more healthily, or get that building work done. At C & SA Thompson Contractors we can’t help you with the first two, but when it comes to groundworks in Leeds or the surrounding areas we fit the bill perfectly.


We’re a family-run business, founded in 1987, and we understand that you don’t always have the time to get on with groundwork and that you might want excavation contractors to get the job started. Let’s face it, ground works are not exactly the glamorous part of the building game, are they? But proper preparation is vital. So, if you’re looking at 2022 as the year you finally get that building work done, give us a call and see how we can help you get the foundations in place and finally get your project underway.

Sunday 11 September 2022

choose quality Leeds drainage services

Safety opening: When planning a riser, do not forget the inspection opening! If there is ever a problem, you can fix it quickly and easily with garden drainage, excavation, and driveways experts like Ground Works Contractors Leeds.


Decline: Meeting these specifications saves a lot of headaches because if the decline is too great, there is a danger that the water will pass over the solid substances and clog the drain. It does not have to be this way if you choose quality Leeds drainage services! That is why in the wastewater downpipe, the supply lines are installed as far as possible with an angle of 87°, that is to say with a slope of only 3°. This is equally true for branches with the same diameter as well as for reduced exits.

And something else: During installation and Groundworks in Leeds, the end of the sleeve indicates the direction from which the water is coming!

Drain pipes should be installed by the Excavation Contractors Leeds with a slight slope. In this way, the tube has sufficient ventilation and the noise level remains low.

Length compensation: A very important thing when installing HT tubes. Temperature fluctuations can cause an expansion in the material. So that the tube does not suffer from the tensions, it needs a little margin of play. And that is not difficult at all. Afterward, the tube is enough to re-stretch the sleeve 1cm.